Planning & renovation
Discuss the whole kitchen, from the working layout to the final finishes.
Start with the way you cook, gather and move through the room. Build a plan for the layout, storage and finishes that matter to you.
(877) 907-2217
Cabinets, counters, islands and lighting from recent kitchen projects. Swipe or use the arrows to browse more.
















A kitchen renovation starts with a few practical questions. What gets in the way? Where do you need more storage? Which parts of the room still work?
Keeping a useful layout can leave more of the budget for cabinets, counters and lighting. Moving walls or plumbing calls for a different plan. Discuss those choices before ordering materials.
From a cabinet refresh to a complete renovation, connect the work to your priorities.
Discuss the whole kitchen, from the working layout to the final finishes.
Compare new cabinetry, refacing and painting around what is worth keeping.
Coordinate work surfaces, edge details and the wall finish behind them.
Make room for preparation, seating and practical movement through the kitchen.
Look at the surfaces underfoot and the light you need where you work.
Plan the sink, faucet and appliance connections alongside the rest of the room.

Set the scope before choosing individual products. A clear sequence helps you see which decisions affect the budget, approvals and installation.
Look at the layout as well as the finish: island seating, cabinet height, counter space and lighting.


Serving selected communities across nine states and Washington, DC. Find your location below, then explore its kitchen remodeling guide and cost estimator.
Have a question about your address or building? Call (877) 907-2217 to check the project.
438 approved service locations
Use $15,000–$35,000 for a minor remodel, $35,000–$75,000 for a mid-range project and $75,000–$150,000 or more for a major remodel as national planning ranges. Kitchen size, finishes, layout changes and site conditions can move the total. The estimator is a starting point, not a quote.
That depends on the cabinet boxes, hardware and layout. Refacing or painting may make sense when the structure is sound and storage already works. New cabinets are worth discussing when boxes are damaged or the kitchen needs a different layout.
The schedule depends on design decisions, product lead times, approvals and the work involved. Ask for a project-specific schedule, including when the sink, cooking area and appliances will be unavailable. A single timeline would not fit every kitchen.
Structural, electrical, plumbing and gas changes can require permits. Requirements depend on the address and scope. Check the applicable building department before work starts; cosmetic changes and replacements may be treated differently.
The service-area directory lists the approved communities in Arizona, Florida, Kentucky, Maryland, Minnesota, New Jersey, Pennsylvania, Texas, Virginia and Washington, DC. Coverage is limited to those listed locations. Call to check the address and project.
Useful starting details include your address or ZIP code, approximate room dimensions, a few photos, a budget range and the changes you want. Note any planned wall removal, appliance relocation or building restrictions.
Have your location, approximate kitchen size and main priorities ready. We can discuss your project and the next step toward an estimate.